Hero Section
MD 355 Crossing (BRAC) | Projects Portfolio

MD 355 Crossing (BRAC)

Client: WMATA
Location: Medical Center Station, Bethesda, MD
Timeline: 2016–2023

Overview: This project involved designing the power and lighting systems for a new pedestrian underpass and elevator installation at the Medical Center Station to improve accessibility and safety.

Scope of Work: Our team developed electrical design plans for the underpass tunnel lighting, elevator system integration, backup power routing, and long-term maintainability in coordination with station operations and BRAC (Base Realignment and Closure) planning.

Key Features:

  • High-efficiency LED tunnel lighting
  • Weather-resistant elevator control panels
  • Integrated emergency backup power circuits
← Back to Portfolio
Project Demo

Expandable Project Description Demo

MD 355 Crossing (BRAC) – Medical Center Station (2016–2023)
Designed power and lighting systems for the underpass and elevators at the Medical Center Metro Station as part of the BRAC initiative.
Forest Glen Station Underpass (2021–Present)
Power and lighting system design for a new pedestrian underpass and elevator connections at Forest Glen Metro Station.