Bethesda Station South Mezzanine, WMATA

Projects / Bethesda Station South Mezzanine, WMATA

Bethesda Station South Mezzanine, WMATA

Duration: 2024–Present

(EPCM, Inc. part of Clark/EXP Design-Build (2024-Present)

The project includes construction of a new mezzanine and passageway connecting to Purple Line. EPCM is responsible for the design of entire WMATA part of power, lighting, and coordination with existing station electrical system to feed new loads including two elevators and two escalators.

Next
Next

Dulles Corridor Metro Rail Phase 1