Projects / Silver Line Phase 2 Existing System Signage Upgrades and Replacements
Silver Line Phase 2 Existing System Signage Upgrades and Replacements
Duration: 2019–2023
Owner: WMATA
Cost: $10 Million
(EPCM, Inc. part of Clark Design Built Team (2019-2025)
The project included upgrades and replacements of signage at 15 stations. EPCM was responsible for design and construction period services for electrical and communication design, including fiber cables for the entire project.