Dulles Corridor Metro Rail Phase 2A

Projects / Dulles Corridor Metro Rail Phase 2A

Dulles Corridor Metro Rail Phase 2A

Duration: 2013–2020

Owner: MWAA/WMATA

Cost: $1.19 Billion

(EPCM, Inc. part of Clark/Dewberry Design Build team 2013 - Present)

EPCM, Inc. responsible for design of electrical power, lighting and signage around toll road including construction period services.

Previous
Previous

Dulles Corridor Metro Rail Phase 1

Next
Next

Dulles Corridor Metro Rail Phase 2B