Projects / Dulles Corridor Metro Rail Phase 2A
Dulles Corridor Metro Rail Phase 2A
Duration: 2013–2020
Owner: MWAA/WMATA
Cost: $1.19 Billion
(EPCM, Inc. part of Clark/Dewberry Design Build team 2013 - Present)
EPCM, Inc. responsible for design of electrical power, lighting and signage around toll road including construction period services.